CONSTRUCTION OIL EXTRACTION PLANT LLC «VOLGA TERMINAL» Saratov region, Balakovo district, p. Zatonsky

CONSTRUCTION OF A WASTE OIL TREATMENT PLANT OF JSC "DELPHIN GROUP" Moscow region, Pushkino

THE CONSTRUCTION OF THE PLANT FOR THE PRODUCTION OF SOY PROTEIN CONCENTRATE the Group of companies ”Sodrugestvo” Kaliningrad region, Svetly

We construct complex industrial facilities, workshops and plants

We build quickly, efficiently and believe that this is what our customers need

Quick

Because life is short and you have a lot to do.
To that end:

own metalwork factory designed
for the production of buildings on bolted joints

Our own staff is involved in all works

mobile automated workshop
for the production of insulating casings

reliable database
contractors

Quality

Because the plant has to look beautiful:

equipped factory

mobile workshop for the production of protective covers for insulation

certified personnel and equipment

NAKS certified welding technologies

In-house laboratory for nondestructive testing

we don’t want it any other way,
It’s either good or nothing.

As a result, it is possible to cite

Construction of a preparation shop at Balakovo MPEZ

0

to the Reztsoff

0

sandwich panels

0

power and control cables

0

installation

0

pipelines

0

automatic devices

0

transporters

0

trays

0

installation time.
In the winter period

We work all over Russia

Резцофф. Об отношении компании к своему делу.Резцофф. Об отношении компании к своему делу.

OUR CUSTOMERS

We are recommended

Partners about us

Our news

Installation work has been completed at the plant for the production of aluminum profile “LightСonstruction” Voronezh

LLC “Reztsoff” performed work on the installation of technological equipment when the plant’s production facilities were moved to a new production building. The complex of works included dismantling, transfer, installation of technological equipment, electrical installation works. The installation of the extrusion line SMS Eumuco GmbH and OMАV S.p.A. has been completed. The work was completed in 2.5 months.

Read more